东江三号

揽佬SKAI ISYOURGOD

intro

Fuck/Do it

verse

The congee stall by the Dongjiang River (hey), all parked with large displacement cars (wow)

Take out the Cordon Bleu and put it on the table, first order the three-cup intestines (awesome)

Guangzai had a second child (born), Mingzai got extra apartments (earned)

Jikai's jade is shining bright, a 3D Guanyin statue (oi)

chorus

Made a name for myself (eh), remember to go home first (guaranteed)

They ask me what I'm doing, I just have one sentence (one sentence)

Dongjiang No. 1 crushes over the Dongjiang waves (ah), No. 2 drives onto the Pearl River (eh)

No. 3 drives to the other side of the ocean to teach rap (Lanlao)

verse

Lanlao lifts a foot and steps over continents (steps over)

Those foreigners outside will know Huizhou (eh)

I stand at Hejiang Pavilion watching the river water flow (dope)

I overcome obstacles, so Heaven will bless me (Lanlao)

verse

From Shuimen Bridge, I fight my way into the four oceans (awesome)

River boats enter the sea, Huizhou guys are just that crazy (guaranteed)

Grab an extra liquor glass (ah), uncle wants to come (who?)

Maybach parked at the door (oh), wearing old man slippers

bridge

My son is only six years old and he's listening to your songs

You are very intense oh

I saw the stuff on the internet

It's a mix of true and false

The fish restaurant, the fish restaurant closed down long ago

Now it's better to go open a bar

Open a craft beer bar, right? (Oi)

verse

The congee stall by the Dongjiang River (hey), all parked with large displacement cars (wow)

Take out the Cordon Bleu and put it on the table, first order the three-cup intestines (awesome)

Guangzai had a second child (born), Mingzai got extra apartments (earned)

Jikai's jade is shining bright, a 3D Guanyin statue (oi)

chorus

Made a name for myself (eh), remember to go home first (guaranteed)

They ask me what I'm doing, I just have one sentence (one sentence)

Dongjiang No. 1 crushes over the Dongjiang waves (ah), No. 2 drives onto the Pearl River (eh)

No. 3 drives to the other side of the ocean to teach rap (Lanlao)

verse

The pool table in the basement (I) engraved with Joy (mua)

Stuffed a Yamaha jukebox into the house (sing)

In the kids' room wardrobe (ouch) two cartons of Pride cigarettes (nice)

If your wife sees it, you will fucking explode

verse

If you have trouble on the outside (yes), give me a call (ha)

Don't pretend, if there's really trouble it's very unjust (really)

If you have money, just distribute it to the brothers (eh), Zehao is still fixing wheels (right)

Abin is still installing windows and doors (ah), scrolling the local city feed every day (Lanlao)

verse

This congee stall by the Dongjiang River, the babylonia snails are fucking nice

After eating, fly out of town tomorrow, continue making money (collecting money)

The competition is fucking strong, petty haters are too hard to block (hard to block ah)

Next time I come back, I'll pack red envelopes, one pack a hundred bills (oi)

chorus

Made a name for myself (eh), remember to go home first (guaranteed)

They ask me what I'm doing, I just have one sentence (one sentence)

Dongjiang No. 1 crushes over the Dongjiang waves (ah), No. 2 drives onto the Pearl River (eh)

No. 3 drives to the other side of the ocean to teach rap (ha)

More songs